Acquisition of Cobalt Iron Blanks for ALS-U Project
Summary of important facts, details, and requirements
- Location of work
- Berkeley, CA, USA
- Bids due date
- January 12, 2024
- Department and office
- ENERGY, DEPARTMENT OF
BERKELEY NATL LAB - DOE CONTRACTOR - Set aside
- N/A
Summary
This contract is for the acquisition of cobalt iron blanks that will be used as pole bodies for the Sextupole magnets in the Advanced Light Source (ALS) Storage Ring (SR). The cobalt iron blanks are being replaced as part of the Advance Light Source Upgrade (ALS-U) project.
Requirements and Deliverables:
- - Provide cobalt iron blanks that meet the specifications for use in magnetic applications.
- - The cobalt iron blanks will be used as pole bodies for the Sextupole magnets in the ALS Storage Ring.
- - The cobalt iron blanks must be compatible with the ALS-U project.
- - Deliver the cobalt iron blanks to the specified location.
- - Ensure the cobalt iron blanks are of high quality and meet all necessary standards.
- - Provide any necessary documentation and certifications for the cobalt iron blanks.
This acquisition is for the cobalt iron blanks for the SR Sextupole Magnets that will be part of the ALS-U project.
Full details from SAM.gov
- Location of work
- Berkeley, CA, USA
- Bids due date
- January 12, 2024
- Department and office
- ENERGY, DEPARTMENT OF
BERKELEY NATL LAB - DOE CONTRACTOR - Set aside
- N/A
Details
Cobalt iron is a metal alloy that is well suited for use in magnetic applications. This acquisition is for cobalt iron blanks that will comprise the pole bodies of the Sextupole magnets within the Advanced Light Source (ALS) Storage Ring (SR), which are being replaced as part of the Advance Light Source Upgrade (ALS-U) project.