Civil Subcontractor for Central Utility Building Expansion
Summary of important facts, details, and requirements
- Location of work
- Batavia, IL, USA
- Bids due date
- September 29, 2023
- Department and office
- ENERGY, DEPARTMENT OF
FERMILAB - DOE CONTRACTOR - Set aside
- Total Small Business Set-Aside (FAR 19.5)
SBA
This request seeks a Civil Subcontractor to plan and conduct soil boring activities for the future Central Utility Building (CUB) expansion in the Booster Pond. The project involves dewatering the pond and conducting soil borings at two locations to depths of approximately 30 to 80 feet. The borings will include strength and consolidation testing. The investigation is required for the new construction/addition to the CUB at the Fermilab site. The project is currently in the preliminary design phase and will involve adding onto the existing CUB.
Requirements and Deliverables:
- - Plan and conduct soil boring activities
- - Dewater the pond
- - Perform soil borings at two locations
- - Conduct strength and consolidation testing
- - Provide investigation data for new construction/addition to the CUB
- - Coordinate with the Fermilab site
- - Adhere to project timeline and specifications
Ground Investigation for Conventional Utility Building for the Utilities Infrastructure Project
Full details from SAM.gov
- Location of work
- Batavia, IL, USA
- Bids due date
- September 29, 2023
- Department and office
- ENERGY, DEPARTMENT OF
FERMILAB - DOE CONTRACTOR - Set aside
- Total Small Business Set-Aside (FAR 19.5)
SBA
This request seeks a Civil Subcontractor to plan and conduct soil boring activities for the future Central Utility Building (CUB) expansion in the Booster Pond. The supplemental ground investigation will consist of dewatering the pond and of at least 2 exploration locations to depths of approximately 30 to 80 feet that include strength and consolidation testing. Both borings will be advanced within the footprint of an existing manmade pond. The subsurface investigation is required for the new construction/addition to the CUB at the Fermilab site. The project is presently in the preliminary design phase. It is anticipated that the project will consist of adding onto the current CUB.