The government is seeking contractors to remove and replace the left spillway walkways and piers at DePere Dam in De Pere, Wisconsin. The project involves the removal and replacement of seven steel walkway spans and six reinforced concrete piers, totaling approximately 350 feet in length. The estimated performance period is 720 calendar days, and the estimated cost of the project is between $1,000,000.00 and $5,000,000.00. Small businesses are encouraged to respond to this market survey/sources sought. The requested information includes identification of the company's small business status, unique entity identifier, bonding documentation, and description of past experience. Contractors must have experience in construction of similar type structures and managing multiple subcontractors. They must also self-perform at least 15% of the construction. The submission package should not exceed 8 pages and must be submitted by September 1, 2023.
REISSUED SOURCES SOUGHT NOTICE - MARKET SURVEY/SOURCES SOUGHT for DePere Dam West Spillway Walkway Installation, De Pere, Brown County, Wisconsin
Full details from SAM.gov
- Location of work
- De Pere, WI, USA
- Bids due date
- December 1, 2023
- Department and office
- DEPT OF DEFENSE
W072 ENDIST CHICAGO - Set aside
- N/A
EFFECTIVE NOVEMBER 17, 2023: The government seeks responses to Market Survey/Sources Sought for DePere Dam West Spillway Walkway Installation. Interested respondents shall provide their submittals priorto 3:30 p.m. (Central Time) on December 1, 2023. Negative replies are welcome. See below for complete details. ***************************************************************************************************************************************************** EFFECTIVE SEPTEMBER 1, 2023: The government extends the response date of the Market Survey/Sources Sought for DePere Dam West Spillway Walkway Installation to Wednesday, September 6, 2023.Respondents interested in providing aresponse to this Notice shall provide their submittals priorto 3:30 p.m. (Central Time) on September 6, 2023. ***************************************************************************************************************************************************** By way of this Market Survey/Sources Sought Notice, the USACE-Chicago District intends to determine the extent of firms that are engaged in providing the services described hereunder for the DePere Dam West Spillway Walkway Installation, De Pere, Brown County, Wisconsin.The responses to this Notice will be used for planning purposes for an upcoming procurement. Therefore, this Notice does not constitute a Request for Proposal (RFP); it does not guarantee the future issue of a RFP; nor does it commit the government to contract for any supply or service whatsoever. Further, this Agency will not accept unsolicited proposals. Respondents are advised that this Agency will not pay for any information or administrative cost incurred in response to this Notice; all costs associated with responding to this Ntoice will be solely at the responding party's expense. At this time, proprietary information is not being requested, and respondentsshall refrain from providing proprietary information in response to thisNotice. Responses to this Notice will not be returned. Please be advised thatall submissions become Government property and will not be returned. Notresponding to this Notice does not preclude participation in any future RFP, ifany is issued. In accordance with FAR 15.201(e), responses to this notice arenot offers and cannot be accepted by the U.S Government to form a bindingcontract. It is the responsibility of the interested parties to monitor this sitefor additional information pertaining to this Notice. GOVERNMENT REQUIREMENTS: Under the planned contract, the contractor will be required toremove and replace the left spillway walkways and piers at DePere Dam, located in De Pere, Wisconsin. The work consists of removal and replacement of the seven steel walkway spans including superstructure and six reinforced concrete piers. Total walkway with railings length is approximately 350 feet. All interested Small Businesses, certified HUBZONE, 8(a), Woman-Owned Small Business or Service-Disabled Veteran Owned Business contractors should respond to this market survey/sources sought via email no later than Friday, September 1, 2023 at 3:30 p.m. Central Time. Estimated Performance Period: 720 calendar days under NAICS 237990Other Heavy and Civil Engineering Construction Estimated Cost: Between $1,000,000.00 and $5,000,000.00 REQUESTED INFORMATION: 1. Identification and verification of the companys small business status. 2. Contractors Unique Entity Identifier (UEI)) and CAGE Code(s). 3. Documentation from the firms bonding company showing current single and aggregate performance and payment bond limits. 4. Description of Experience Provide descriptions your firms past experience up to three (3) projects with greater than 95% construction complete or those projects completed within the last five years which are similar to this project in size, and scope. Provide documentation demonstrating experience for construction of similar type structures and managing multiple sub-contractors. Demonstrate experience including self-performing 15% of the construction. Provide documentation demonstrating experience for projects of similar type projects. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages and quality of performance. a. Projects similar in Scope to this project included: Fabrication and installation of steel and concrete structures in a marine environment; coffer dam or other water control measures. b. Projects similar in size to this project include: Demolition, fabrication and installation of steel and concrete structures in a marine environment; use of water control methods. Construction contract greater than $1 million in total cost. c. Based on definitions above, for each project submitted include: i. Current percentage of construction complete and the date when it was or will be completed. ii. Size of the project iii. Scope of the project iv. The dollar value of the construction contract v. The percentage of work that was self-performed as project and/or construction management services or physical construction type work. Must be at least 15% self-performed. vi. Whether the project was design build or design/bid/build vii. Identify the number of subcontractors by construction trade utilized for each project. 5. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firms own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished. NOTE: Total submittal package shall be no longer than 8 pages. Please only include a narrative of the requested information; additional information will not be reviewed. SUBMISSION OF RESPONSES: Respondents interested in providing aresponse to this Notice shall provide their submittals to Ericka Hillard priorto 3:30 p.m. (Central Time) on September 1, 2023, via email to: (ensurethat the number & title of the Sources Sought Notice of "W912P623S0011,Depere West Walkway, is included in the subjectline of the email). Any electronic files (EMAIL) CANNOT EXCEED thisAgency's size limit of 20MB (includes email and its attachment); filesexceeding this size will be denied access to Ms. Hillard's email inbox.NEGATIVE REPLIES ARE WELCOMED.