GAOA GIBBS WASH BRIDGE REPLACEMENT
Summary of important facts, details, and requirements
- Location of work
- Tucson, AZ, USA
- Bids due date
- October 3, 2023
- Department and office
- AGRICULTURE, DEPARTMENT OF
USDA-FS, CSA SOUTHWEST 7 - Set aside
- Total Small Business Set-Aside (FAR 19.5)
SBA
Summary
This contract is for the replacement of the Gibbs Wash Bridge in the Coronado National Forest, AZ.
Requirements:
- - Design and construction of a new bridge
- - Ensure compliance with all safety regulations
- - Use durable and sustainable materials
- - Complete the project within the specified timeline
Deliverables:
- - Detailed bridge design plans
- - Construction progress reports
- - Final inspection and approval of the completed bridge
GAOA Gibbs Wash Bridge Replacement, Coronado National Forest, Az
Full details from SAM.gov
- Location of work
- Tucson, AZ, USA
- Bids due date
- October 3, 2023
- Department and office
- AGRICULTURE, DEPARTMENT OF
USDA-FS, CSA SOUTHWEST 7 - Set aside
- Total Small Business Set-Aside (FAR 19.5)
SBA
Details
GAOA GIBBS WASH BRIDGE REPLACEMENT, CORONADO NATIONAL FOREST, AZ.