Gate Safety and Operational Components Installation
Summary of important facts, details, and requirements
- Location of work
- Rio Vista, CA, USA
- Bids due date
- September 15, 2023
- Department and office
- HOMELAND SECURITY, DEPARTMENT OF
BASE ALAMEDA(00031) - Set aside
- Total Small Business Set-Aside (FAR 19.5)
SBA
This contract is for the removal and installation of gate safety and operational components for an entry/exit gate. The contractor will be responsible for providing all necessary parts, labor, materials, tools, and supervision. The scope of work includes:
- - Removing and disposing of the existing gate operator and motor
- - Removing and replacing the chain-link fence and gates
- - Saw cutting asphalt for the installation of new gate loops
- - Patching asphalt as required
- - Removing existing auto gate system components
- - Installing a new entry/exit gate motor and appurtenances
- - Installing a cellular keypad/intercom system
- - Replacing guide rollers and installing expanded metal on the roller gate
- - Installing wireless entry/exit buttons
- - Replacing gate locking hardware
- - Installing all required safety sensors
- - Extending gate catch to prevent gate from being pushed open
- - Properly disposing of all old equipment and hardware
- - Testing and ensuring all gate components are in operating status
Reference Notice ID: 30890QDL0000007
USCG Sta Rio Vista Gate Component Replace/Repair
Full details from SAM.gov
- Location of work
- Rio Vista, CA, USA
- Bids due date
- September 15, 2023
- Department and office
- HOMELAND SECURITY, DEPARTMENT OF
BASE ALAMEDA(00031) - Set aside
- Total Small Business Set-Aside (FAR 19.5)
SBA
To include, but not limited to providing all parts, labor, materials, tools, and supervision to remove and install all required gate safety and operational components for entry/exit gate. Remove and dispose of existing operator and gate motor. Remove existing chain-link fence and gates as needed to install all new components. Saw cut asphalt for removal and installation of new entry and exit gate loops. Patch all asphalt as required for electrical, access control, unused boxes, etc. Remove existing auto gate system components. Provide new entry/exit gate motor and required appurtenances. Install new Cellular keypad/ intercom system. Replace guide rollers, guide roller guard and install expanded metal on roller gate. Install two (2) wireless entry/exit buttons for guard shack and unit COMMS, including all wiring associated from gate to existing electrical point of connection. Replace gate locking hardware on 36-inch entry gate. Install all required safety sensors. Extend gate catch to prevent gate from being pushed open. Properly dispose of all old equipment and associated hardware. Test and ensure all gate components are in operating status IAW manufactures specifications. Referencie Notice ID:30890QDL0000007 in the subject line of any email correspsondence.