Remove and Replacement of Garage Door at US Coast Guard Station Quillayute River
Summary of important facts, details, and requirements
- Location of work
- La Push, WA, USA
- Bids due date
- September 8, 2023
- Department and office
- HOMELAND SECURITY, DEPARTMENT OF
BASE SEATTLE(00033) - Set aside
- Total Small Business Set-Aside (FAR 19.5)
SBA
Summary
This contract is requesting the removal and replacement of the garage door at the US Coast Guard Station Quillayute River. The new garage door should be a 10 2 x 8 3 NW MODEL 924 INSULATED WITH VINYL BACK SECTIONAL DOOR WITH 3 WINDOW LITES IN TOP SECTION that functions and operates properly.
Requirements:
- - Remove existing garage door
- - Install new garage door
Deliverables:
- - Fully functioning and properly operating garage door
Garage Door Replacement
Full details from SAM.gov
- Location of work
- La Push, WA, USA
- Bids due date
- September 8, 2023
- Department and office
- HOMELAND SECURITY, DEPARTMENT OF
BASE SEATTLE(00033) - Set aside
- Total Small Business Set-Aside (FAR 19.5)
SBA
Details
Remove and replacement of garage door at US Coast Guard Station Quillayute Riverwith new garage door 10 2 x 8 3 NW MODEL 924 INSULATED WITH VINYL BACK SECTIONAL DOOR WITH 3 WINDOW LITES IN TOP SECTION that functions and operates properly.